Reliability Discussion Forum  

Go Back   Reliability Discussion Forum > Reliability Discussion Forums > General Reliability Discussion > Reliability & Maintenance

Reply
 
Thread Tools Display Modes
  #1  
Old January 18th, 2016, 09:06 AM
huron2016 huron2016 is offline
Junior Member
 
Join Date: Aug 2007
Posts: 4
Default Reliability Hot Wire Issue 179 /The Optimum Overhaul Time Calculation in RGA

Just some inquires -

1. the case of "three systems" in the the article - what does "three systems" refer to? three different units? three sub-assemblies in the same part? or?

2. how to use the fail data from these three systems? line up all failures of all three systems from the smallest failure time to largest and run Power Law?
3. How is the result compared to that out of the actuarial? to that out of the time where the combined cost of the scheduled and the unscheduled maintenance is the least?

Thanks
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 06:27 AM.


Powered by vBulletin
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright 1992-2014 ReliaSoft Corporation, All Rights Reserved